See it before you build it—code-compliant demo, permits, and trades coordinated so your finished kitchen matches the 3D model.
See your new kitchen before construction starts. Our 3D modeling shows the exact demolition areas, the expanded layout, and finishes—so budgets, timelines, and expectations are clear from day one. From design to final inspection, Bendezu manages the whole process across Cape Coral, Fort Myers, Naples, and all SWFL.
Explore related services and info: Contact · Screen Enclosures.
We build a to-scale model of your existing kitchen and the proposed layout—down to cabinet lines, appliance specs, lighting layers, tile patterns, and clear “demo vs. build” zones colored by scope. That means:
Why it matters in SWFL: Open concepts, exterior walls, and tie-ins to lanais or outdoor kitchens often involve structural considerations and humidity management—3D makes these visible early.
We execute demolition with licensed, insured crews and handle paperwork end-to-end:
We field-verify dimensions, levelness, plumb, and square; scan for studs/joists, confirm slab thickness, and note MEP entry points. Site photos create a “before” record.
You’ll receive a primary scheme plus value and premium alternates (materials and scope). Each option shows cost deltas and schedule impacts—no surprises.
We submit the set, track comments, and schedule subs against the approved model: panel loads, circuit counts, GFCI/AFCI, venting and make-up air, sink/disposal locations, and hood duct routes.
Expect a daily photo log and bullet update: what was completed, what’s next, pending decisions. Rough-ins match the model: box heights, outlet spacing, water lines, gas (if used), and duct runs.
We walk the space, complete punch-list, provide warranties, appliance manuals, and finish schedules. You keep the as-built model for future upgrades.
Typical 3D & pre-construction: 1–2 weeks (site measure, model, options, pricing, permit prep).
Kitchen demo & rough-ins: 1–2 weeks depending on scope and inspections.
Cabinet install, tops, tile, finish: 2–4+ weeks, driven by lead times and material choices.
We’ll price your specific model and selections so numbers reflect your home and finish level—no generic allowances.
Do I need permits for a “non-structural” remodel?
If you’re moving plumbing/electrical or altering ventilation, permits/inspections are typically required. We’ll confirm with your jurisdiction.
Can you work with my cabinet supplier or designer?
Yes—we coordinate to ensure shop drawings match the model and site conditions.
What about living in the home during demo/build?
We set up dust control, safe pathways, and daily cleanup. For heavy demo or major MEP work, you may prefer temporary accommodations.
What if hidden conditions appear?
We document with photos, propose options in the model, and show cost/schedule impacts transparently before proceeding.
Ready to see your new kitchen in 3D and build it exactly as planned? Let Bendezu manage design, demo, permits, trades, and inspections—from first measure to final close-out.